The Complete AV Checklist for Opening a New Gym or Fitness Studio in Atlanta

August 27, 2026
Paul Tordik

Paul Tordik

Founder / President
golf simulator image

Opening a gym means keeping track of hundreds of decisions at once. Flooring, equipment, mirrors, signage, staffing, memberships, inspections, and construction deadlines are all competing for attention. With so much happening, commercial AV services can easily become something everyone assumes can be handled later… but later gets expensive, fast! 

If the front-desk Wi-Fi is unreliable, an instructor cannot control the sound in a studio, or a camera misses the area you would want to review after an incident, the easy construction window may already be gone. The walls are finished. The ceiling is closed. The flooring is down. A cable that would have been simple to run a few weeks earlier can now mean cutting back into finished work and coordinating another round of access.

This gym AV checklist is meant to help Atlanta-area owners and project teams make the important audio, video, networking, camera, control, and low-voltage decisions while the building is still easy to work in. The goal is simple: fewer expensive surprises near opening day and a system that is ready when your members are.

Start With How the Gym Will Operate

Before we talk about speakers, screens, cameras, or access points, we want to understand the gym you are building. A 24-hour strength gym, a large health club, and an immersive group fitness studio can all benefit from professional commercial AV, but the experience, staffing, and technology demands are very different.

We look at which spaces will be active at the same time, where instructors and staff will work, how members move through the building, and which parts of the experience are central to the brand. We also ask what might change after opening. Maybe another studio is part of the long-term plan. Maybe more displays or cameras are likely. Knowing that now can influence what is worth wiring for while the pathways are open.

That conversation keeps the technology tied to the business instead of turning the project into a shopping list of equipment. It also gives the architect, contractor, electrician, and AV team a clearer picture of what the finished building has to support.

For a closer look at how the major systems fit together, read our post: Gym AV Systems: Sound, Video, Wi-Fi, and Security Cameras Explained.

Bring the AV Team Into the Build Before the Walls Close

One of the easiest ways to control AV costs is to make the decisions while the building is still easy to work in. The best time to involve us is during design, when the floor plan and ceiling plan are still flexible enough to coordinate mounting locations, pathways, power, and equipment space with the rest of the project.

Once construction is underway, our preferred prewire window comes after the electrician, HVAC contractor, and plumber have completed their rough-in work but before insulation and sheetrock. At that point, the major building systems are established, while the walls and ceilings are still open for low-voltage cabling.

Late Prewiring Can Change a One-Day Job Into Four Days

We recently worked on a new fitness facility where AV was brought into the project after much of the finished construction was already in place. What probably could have been about a one-day prewire turned into roughly four days of work. We estimate the late coordination increased the prewire cost by at least 50%.

That is the kind of expense no owner wants to discover late in a build. Early planning does not mean buying every speaker, screen, camera, or access point you might ever want. It means leaving sensible pathways and capacity while doing so is still relatively simple.

That experience is one reason we encourage owners to bring AV into the design conversation early. Our article, Commercial AV for Gyms: How Audio, Video, Lighting, and Security Shape the Member Experience, takes a closer look at what can happen when audio, video, networking, and other systems are planned as part of the facility rather than added at the end.

Plan the Gym Sound System Around the Spaces

Sound is one of the first things members feel when they walk into a gym, and it can be surprisingly difficult to fix after the fact. Before prewire begins, we want to know which areas will operate independently, where speakers will go, which rooms will use instructor microphones, and who will control each space.

A lobby might call for comfortable background music while a group fitness room carries enough energy for a class. The main floor could share the same source as another area but run at a different volume. Those choices affect speaker wire, controls, network connections, and equipment locations, so the useful time to make them is before those pathways disappear behind finished surfaces.

For a deeper look at that planning, see How to Zone Audio in a Gym: Cardio Floor, Weight Room, Group Fitness, and Lobby.

If you are planning the audio portion of the project now, our commercial audio distribution systems are designed around how each space will sound and operate.

Decide What Every Screen Is Supposed to Do

A television or digital display is much easier to plan when everyone agrees on its job. Will it show live television, class schedules, branded content, promotions, workout demonstrations, or something else? Where will members be standing or exercising when they view it?

Those answers affect sightlines, sources, network connections, power, mounting, and control methods. Working through them during the build is far easier than discovering later that a screen is in the wrong place or the content source has no clean path to reach it.

For facilities with multiple displays and shared sources, commercial video distribution can simplify how content is delivered and controlled throughout the gym.

Treat Commercial Networking as Part of the Build-Out

Wi-Fi complaints may come from members, but the network behind a modern gym carries far more than guest internet. Check-in systems, staff devices, televisions, audio controls, cameras, and other connected equipment can all depend on it.

Before prewire, we map wireless access points, identify permanent devices that are better hardwired, locate the internet service entry, and account for switch and rack capacity. Making those decisions early gives the network a real place in the construction plan instead of asking it to fill whatever gaps are left later.

Once the building takes shape, we test the commercial networking system. An empty construction site is not the same environment as a working gym full of equipment, people, phones, televisions, cameras, and other devices.

Put Security Cameras Where the Footage Will Be Useful

Security cameras are another place where more does not automatically mean better. What matters is whether the system captures the areas an owner would want to review later.

Choose those locations while cabling and mounting points are still easy to coordinate. Depending on the facility, that could include entrances and exits, reception, the workout floor, main hallways, member cubbies, and exterior areas. Privacy still matters, so cameras do not belong in restrooms or other spaces where members reasonably expect privacy.

Do More Than Check the Live View

A live picture only tells you that the camera is on. Before opening, verify recording, date and time settings, authorized access, and the process for finding and exporting a clip. The first lesson in retrieving footage should not happen after an incident.

Our commercial video surveillance systems are planned around useful coverage, recording, and access rather than camera count alone.

Give the Equipment Rack a Real Home

The equipment rack is easy to overlook because members may never see it. Your AV and network systems still depend on what happens there. Give it enough room for the opening-day equipment, appropriate power and ventilation, secure access, organized cabling, and working space for future service.

A little spare capacity can make future additions much easier. That does not mean building an oversized rack for equipment you may never buy. It means avoiding a setup that is already maxed out on opening day.

And yes, this sounds basic, but the rack has to remain an equipment space. When it becomes the leftover closet for cleaning supplies, boxes, and whatever else has nowhere to go, service gets harder and active equipment can end up crowded or blocked.

Test the Entire AV System Before the Soft Opening

AV installation is not the finish line. Before members arrive, put the system through the same routines it will face once the gym opens. Listen to every audio zone, work the controls, confirm displays and sources, verify network connections, and check camera recording and playback.

If two studios will run at the same time, test them together. If the front desk controls several areas, have someone at the front desk run through those functions. This is where we find the small things that turn into recurring frustrations later: a confusing control label, a microphone with no practical charging location, a screen that is hard to see from the equipment, or a camera angle that looked fine on a drawing but misses the activity.

Leave Room for a Punch List and Retest

Construction schedules move. Internet service, electrical work, millwork, ceilings, flooring, and inspections do not always finish in the order everyone expected. Building time into the schedule for a punch list and retest gives the team a chance to correct problems without turning the night before opening into an AV emergency.

Train the People Who Will Actually Use the System

The system may make perfect sense to the people who designed and programmed it. That does not guarantee it will feel obvious to a new instructor or the person working the front desk on a busy Saturday morning.

Training works best when employees use the controls themselves. Let them change the music in their zone, select screen content, use the instructor controls, find camera footage, and practice basic recovery steps for the problems they are most likely to encounter. Access can vary by role, and the training can reflect that.

The handoff also has to leave the owner with what comes next: system documentation, equipment and cable labels, approved credentials, warranty and support information, and a clear process for requesting service. Months later, nobody wants to hunt through old emails to figure out who has the login or what a cable feeds.

Your Opening-Day Gym AV Checklist

There are a lot of details to keep straight during a gym build-out, especially when AV decisions overlap with electrical, construction, networking, and other trades. We created a New Gym AV Build-Out Checklist you can use with your contractor and project team to keep the important decisions from getting lost in the shuffle.

Download the New Gym AV Build-Out Checklist

Open With a System That Is Ready to Work

Opening day already comes with enough unknowns. The sound, screens, network, cameras, and controls do not have to be among them.

Early AV planning gives the technology a place in the project while changes are still manageable. Testing and training then turn that infrastructure into something your staff can use with confidence. The result is less scrambling at the end of construction and a gym that feels finished when the doors open.

Planning a new gym or fitness studio in metro Atlanta? Schedule an AV system design consultation while there is still time to make the technology part of the build instead of a workaround after it.

Frequently Asked Questions About AV for a New Gym

Q. When is the best time to hire an AV company for a new gym?

A. During design, before finished surfaces begin limiting the options. Once construction starts, our preferred prewire window is after electrical, HVAC, and plumbing rough-in but before insulation and sheetrock. That gives the major trades time to establish their work while leaving the walls and ceilings accessible for low-voltage cabling.

Q. What AV systems are typically part of a gym build-out?

A. Most gyms use some combination of commercial audio, video or digital signage, commercial networking, security cameras, and staff controls. Group fitness concepts often add instructor microphones or more specialized room controls. The mix depends on how the facility operates and the experience the owner is trying to create.

Q. Who belongs in the gym AV planning conversation?

A. The owner or operator, general contractor, architect or designer, electrician, AV integrator, and whoever is responsible for networking all have pieces of the puzzle. Early coordination matters because mounting, power, ceilings, walls, millwork, and cable pathways often cross trade lines.

Q. Can speakers, displays, or cameras be added after the gym opens?

A. Usually. Future additions are much easier when the original build leaves sensible pathways, rack capacity, network capacity, and power in the right places. That is different from buying equipment before it serves a purpose; it simply keeps reasonable options open.

Q. How long does a gym AV installation take?

A. It depends on the size of the facility, the systems involved, construction access, and coordination with other trades. Allow time for prewire, equipment installation, programming, commissioning, staff training, and corrections. Waiting until the end of the build to account for those steps can create unnecessary pressure right before opening.

Q. How much should a new gym budget for AV?

A. Two gyms with the same square footage can have very different technology requirements, so a flat price per square foot is rarely useful. The budget is shaped by audio zones, speaker coverage, displays and sources, wireless access points, cameras, controls, construction access, and the low-voltage infrastructure behind them. Bringing the AV team into the design process gives us a better chance to define that scope before late construction changes start adding cost.